Jump to main content.


Return to home page

On This Page
State: Idaho
Waterbody ID:
Other ID: ID16010204BR002_02
State List ID: ID16010204BR002_02
Location:
State Waterbody Type: River
EPA Waterbody Type: Rivers and Streams
Water Size: 10.01
Units: miles
Watershed Name: Lower Bear-Malad

Waterbody History Report

Data are also available for these years: 2010 2008 2006 2004

2002 Waterbody Report for Devil Creek - Devil Creek Reservoir Dam To Mouth


Click on the waterbody for an interactive map


Causes of Impairment for Reporting Year 2002


Description of this table
Nutrients Nutrients TMDL completed
Siltation Sediment TMDL completed

Top of page



TMDLs That Apply to this waterbody


Description of this table
Bear River/Malad River Subbasin Assessment And Tmdl Plan Jun-29-2006 Escherichia Coli (E. Coli) Point/Nonpoint Source Nutrients; Siltation
Bear River/Malad River Subbasin Assessment And Tmdl Plan Jun-29-2006 Nitrogen Nonpoint Source Nutrients; Siltation
Bear River/Malad River Subbasin Assessment And Tmdl Plan Jun-29-2006 Phosphorus Point/Nonpoint Source Siltation; Nutrients
Bear River/Malad River Subbasin Assessment And Tmdl Plan Jun-29-2006 Total Suspended Solids (TSS) Point/Nonpoint Source Nutrients; Siltation

Top of page



Previous Causes of Impairments Now Attaining All Uses


Description of this table
Cause Unknown 2004, 2006, 2008 Sep-29-2011 Applicable WQS attained; original basis for listing was incorrect. 7/28/2010 (NED) - During the development of the Bear River/Malad River Subbasin Assessment and TMDL, approved 6/29/2006, it was determined that the cause of the impairment (cause unknown) was phosphorus (total). Therefore, cause unknown has been delisted and replaced with phosphorus (total). The TP load allocation for Devil Creek is 67 kg/year. Refer to page 28 of the TMDL for additional information.
Cause Unknown 2004, 2006, 2008 Sep-29-2011 Applicable WQS attained; original basis for listing was incorrect. 7/28/2010 (NED) - During the development of the Bear River/Malad River Subbasin Assessment and TMDL, approved 6/29/2006, it was determined that the cause of the impairment (cause unknown) was phosphorus (total). Therefore, cause unknown has been delisted and replaced with phosphorus (total). The TP load allocation for Devil Creek is 67 kg/year. Refer to page 28 of the TMDL for additional information.
Cause Unknown 2004, 2006, 2008 Sep-29-2011 Applicable WQS attained; original basis for listing was incorrect. 7/28/2010 (NED) - During the development of the Bear River/Malad River Subbasin Assessment and TMDL, approved 6/29/2006, it was determined that the cause of the impairment (cause unknown) was phosphorus (total). Therefore, cause unknown has been delisted and replaced with phosphorus (total). The TP load allocation for Devil Creek is 67 kg/year. Refer to page 28 of the TMDL for additional information.

Top of page



Jump to main content.